Good price tomato powder production line packaging machine

FOB Reference Price:Get Latest Price
US $15,000-20,000 / Pieces | 1 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Type:
Packaging Line
Condition:
New
Application:
Beverage, Commodity, Food, Medical
Packaging Type:
Bottles, Cans, Film, Pouch, Stand-up Pouch, Tin
Packaging Material:
Glass, Paper, Plastic
Automatic Grade:
Automatic
Driven Type:
Electric
Voltage:
220V
Power:
7.5kw
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Jinchi Machinery
Model Number:
JS-Line
Dimension(L*W*H):
7450*1000*1800mm
Weight:
7300KG
Certification:
CE ISO
After-sales Service Provided:
Engineers available to service machinery overseas
Name:
Good price tomato powder production line packaging machine
After-sales Service:
Full life
Manual:
English version
Layout:
AutoCAD format according to client's workshop
Guarantee:
1 year
Training:
Provide by technician in commissioning service
Supply Ability
Supply Ability:
30 Set/Sets per Month
Packaging & Delivery
Packaging Details
Fumigation wooden cases, which are well sealed and strong enough for long term trip, and suitable for multi-times loading & unloading by forklift.
Port
Shanghai
Lead Time :
20-45 days

Good price tomato powder production line packaging machine

 Work process                                                                               

The machine is mainly used for packing powder and flour products, such as nutritional powder, baby food, sesame paste, salt, sugar, flour, starch, flavors, milk powder, albumen powder, etc.

Samples                                                                                         

 750_

 

Certificate                                                                                     

1

Feature                                                                                           

1.Fully automatic and continuous, and easy to connect with other processing machinery;

 2.Combined many functions into one: Conveying materials - Weighing materials - Making bags - Filling materials - Filling air or nitrogen (needs additional Air compressor or Nitrogen Generator) - Sealing bag - Printing date & code - Hitting holes - Conveying final bags;

 3.PLC and touch screen control;

 4.High precision with weight error of ±0.1-0.5%;

 5.High efficiency without crashing the materials;

 6.Many kinds of compound film can be used, like BOPP/CPP, OPP/VMCPP. BOPP/PE, PET/VMPET/PE, PET/AL/PE, NY/PE, PET/PET, etc

Technical Parameters                                                                   

 

Model No

JC-320

JC-420

JC-530

JC-730

Packaging accuracy

±0.2-0.5%

Packing speed

30-50 bag/min

25-45 bag/min

Bag width

<  150

<  200

<  250

<  350

Bag length

<  200

<  300

<  320

<  450

Max film width

<  320

<  420

<  530

<  730

The film thickness

0.04-0.08

0.04-0.08

0.08-0.12

0.08-0.12

Machine power

3 Kw

3.7 Kw

4.2 Kw

5.4 Kw

Working pressure

0.4-0.6 Mpa

Gas consumption

100L/min

150L/min

180L/min

210L/min

Weight

350 kg

580 kg

730 kg

870 kg

Dimension(L*W*H)

1.2x0.8x2.1

1.5x0.95x2.5

1.5x1.16x2.6

1.8x1.3x2.8

Bag type

Back seal bags (pillow type bag)

 

Main Equipment                                                                            

 

-3-2IMG_0472_

 

Packing & Shipping                                                                      

_

Commissioning & After-sales Service                                        

We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electric power, water supply, gas power, material storage, final storages, workers’ restroom, etc.

If customer need, we will send engineer for the commissioning service. 1,2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
 
Our engineers have responsibility to train and teach the workers how to operate, clean, maintain the repair all the machine, until the worker could well operate the production line.

It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service. 
 
The engineer’s flight tickets, accommodation and daily salary USD 100 are on client’s account.

 

Company Information                                                                   

factory--Jinchi

 OW44EXCBN(EX{D](SGW$MFN